Search here

Tuesday 6 February 2018

List of New Sanctioned Works and Pink Book 2018-19

Shortcut for → PINK BOOK 2018-19 
(Ministry of Railways)



List of  New Sanctioned Umbrella Work under Traffic Facility PH-16 2018-19


SN
Rly
Name of Work
Cost
Allocation
CAP
DRF
DF3
RRSK
1
CR
New works of coaching complex,crossing station, removal of spring point, provision of catch siding, IBH, unification of facilities for freight stock, extension of loop lines and increasing CSL
225
27
0
193
5
2

ER
New bypass line & capacity enhancement works
340
295
0
45
0
ER
New yard remodeling for full length accommodation works
300
281
0
19
0
3
NR
New works for development of coal siding & freight terminal, improvement to goods terminal, IBH, 3rd & 4th Line, additions/alterations for merger with DFC.
125
125
0
0
0
4
NER
New works for provision of Double Distant & Second Distant Signals and 3 Line crossing stations at two stations.
100
0
0
100
0
5

NFR
New works for improvement of coaching complexes
360
0
0
0
360
 NFR
New yard remodeling & goods facility improvement works
200
20
0
0
180
6
SR
New works of yard modification to improve speed, IBH and development of new coaching terminal.
150
15
70
55
10
7
SCR
New works for provision of crossing station, IB Signals, conversion of loop lines, additional loop lines, bypass line and yard remodelling.
100
72
0
28
0
8
SER
New works for provision of crossing stations, additional loop lines, extension of loop lines and removal of diamond crossings.
100
61
0
35
4
9
WR
New works for development of second terminal, removal of diamond crossing and provision of crossovers.
50
45
0
0
5
10
ECR
New works for development of goods terminal, IBP, bypass line, yard remodelling and platform, stabling lines, goods reception & departure lines.
170
147
0
23
0
11
ECoR
New works for provision of crossing station, IBS, automatic block signaling, connectivity from coaching complex to station, additional loop and extension of loop.
215
215
0
0
0
12
NCR
New works for splitting of two block sections, provision of logistic park, chord line, satellite station, sand humps, simultaneous movement and conversion to B Class station.
275
239
0
0
36
13
NWR
New works for twin single line, double stack container rakes, conversion to Block Station and additional loop at one station.
225
208
0
17
0
14
SECR
New works for doubling of bypass, line, IBS, conversion to twin single line and running line, conversion to single block station, additional full length line and loop line with extensin of bridge, extension of line with passenger platform, provision of shunt signal, automatic signaling, shifting & providing new goods shed.
280
243
0
37
0
15
SWR
New forks for development of coaching terminal, automatic signaling,yard remodelling and additional loop/stabling/running line.
250
250
0
0
0
16
WCR
New works of chord line.
135
107
0
28
0


TOTAL COST
3600
2350
70
580
600




New Individual Work

S.No.
RLY
STATE
NAME OF WORK
ALLOCATION
COST
1 #
SWR
Karnataka
Development of Satellite Terminal at NAGANAHALLI(NHY) in SBC Division
CAP
789.29
# expenditure on this work will be made only after following due processes/mandatory approvals & sanctions.



List of New Sanctioned Original Works 
Under Umbrella Works of 
Traffic Facility PH-16 2018-19


S.No.
RLY
Name of Work
Allocation
Cost
(Rs. Cr.)
1
CR
Development of Coaching Complex for  long distance Trains in place of Parel  workshop area.
DF3
194.20
2
CR
Maramjhiri~~ Dharakhoh Station(ET_AMF section) Removal of Spring Point and Provision of seperate catch siding.
RRSK
4.62
3
CR
BHUSAWAL YARD - Unification of maintenance, repair & examination activities of freight stock.
CAP
5.39
4
CR
BORGAON station - Proposed extension of Up & DN loop line to achieve 753 M CSR.
CAP
3.73
5
CR
Solapur~~Wadi~~Provision of IBH between TLT-AKOR stations
CAP
3.52
6
CR
Tadali~~ Tadali-Ghugus - New crossing station with 1 loop line (725 m csl) (14.11 km)
CAP
8.79
7
CR
Kamshet~~Shifting of turnout and crossover at KMST for increasing CSL
CAP
3.57
8
ER
Capacity augmentation over STN-JAJ section.
DF3
46.06
9
ER
Jasidih Bye-pass.
CAP
295.24
10
ER
Madhupur bye-pass with full-length accommodation at Jagadishpur.
CAP
281.07
11
ER
Full-length loops with isolation at Topsi.
DF3
13.65
12
ER
Gede~~Proposal for Yard remodelling work with new PI building at Gede to accommodate full length goods rake.
DF3
7.67
13
ECR
KRSL: Provision of 3rd goods terminal at KRSL
CAP
7.28
14
ECR
PEH: Yard remodeling for reception of full length train from SER and direct dispatch to DHN.
DF3
22.86
15
ECR
Provision of 8 IBP in GC & CIC
CAP
38.80
16
ECR
Sonnagar bypass line from Chirala Pothu(CPBH) to Bagha Bishunpur(BCJ)
CAP
65.22
17
ECR
MFP - Provision of platforms, Stabling lines, goods reception and departure line towards KVC and, Dismentalliing of scissor and goods line no 06 & 07.
CAP
34.74
18
ECoR
Automatic Block Signalling between Cuttack and Barang.
CAP
65.38
19
ECoR
Provision of a crossing station at Mattagajpur with provision of two loop lines in Cuttack-Paradeep section.
CAP
31.89
20
ECoR
Provision of two additional loop lines at the west side of Bhubaneswar Station.
CAP
56.93
21
ECoR
Mancheswar: Rail connectivity from proposed MCS Coaching Complex to future line no.1 of Bhubaneswar new(BBSN) station along with one shunting neck
CAP
44.03
22
ECoR
Badabandha: One additional loop at Badabandha .
CAP
9.25
23
ECoR
Talcher: Extension of line No. 1 towards TLSB end.
CAP
3.72
24
ECoR
Puri-Malatipatpur: Provision of IBS.
CAP
4.57
25
NCR
Chithari: Splitting of longer block section by converting existing D Class stations to B Class crossing station.
CAP
10.92
26
NCR
BHIMSEN : Provision of logistics park
CAP
97.32
27
NCR
Bah-Udi More- Splitting of more than 40 Kms long block section by providing new crossing station in the section.
CAP
27.03
28
NCR
KHAJURAHO : Provision of chord line from Mohaba line to Lalitpur line
CAP
33.4
29
NCR
Allahabad Division - Development of Subedarganj station  as satelite Station.
CAP
44.4
30
NCR
Allahabad Division.Provision of 20 Sand Humps/Over runs between Allahabad- Kanpur Section at loop lines at 13 stations .
RRSK
25.64
31
NCR
Kanpur Central - Provision of simultaneous movement from 3rd & 4th line at Ghaziabad end and from North & south lines at Lucknow end.
CAP
19.95
32
NCR
Allahabad Division- Conversion of 'D' class station (Vishwanathpuri) into ‘B’ class station between Chunar and Shakteshgarh.(20.94 Km)
CAP
19.80
33
NER
Provision of Double Distant in HDN route JBR-GKC &BUW-SCC SECTION (44 STATIONS & 41 Engg Gate.
DF3
40.23
34
NER
Provision of second Distant Signal in GKP-CHPG route
DF3
21.20
35
NER
Provision of three line crossing stations at Jharekhapur and Khiritown in Lucknow Jn-Mailani section.
DF3
28.10
36
NFR
At New Guwahati Construction of Additional 4 Nos pit lines with cover shed, 12 Nos Stabling Lines , 2 Nos automatic washing plant , 1 Nos Sick line Shed with Office complex ,water supply & drainage and other related works.
RRSK
233.33
37
NFR
AT LMG- Provision updated Coaching complex with shunting neck and remodeling of LMG yard.
RRSK
128.78
38
NFR
At  Guwahati -  Yard remodeling for 26 coaches length platform with provision of second entry and direct connectivity to yard and diesel shed.
RRSK
181.09
39
NFR
NJP: Major improvement of Goods circulating area by provision of surface, merchant room, drinking water facility, lighting etc.
CAP
21.08
40
NWR
JP Division –Twin single line work between Rewari-khatuwas(27.73 km) in RPC section.
CAP
182.82
41
NWR
Jaipur~~Sawaimadhopur~~JP Division – Providing one additional loop line with universal simultaneous reception and dispatch facilities at CKS
CAP
7.59
42
NWR
Works for running of double stack container rakes on Bhagat Ki Kothi - Luni- Samdari - Bhildi Junction section
DF3
16.97
43
NWR
Conversion of Sui Halt station into a block station of RE-HSR section to split the long block section.
CAP
12.59
44
SR
Nemam- Development of new Coaching Terminal (CAP-17 Cr.+DF-50.92Cr.+RRSK -9.38)=77.30 Cr.
CAP,DF3,RRSK
77.30
45
SR
Jolarpettai-Yard modification to improve speed on main line
DRF
68.55
46
SR
Provision of IBH between KJKD and WRA on B line
CAP
4.13
47
SCR
New crossing station between VKB- SSPD
CAP
32.22
48
SCR
Moulaali~~MLY-Conversion of Sdg1 as UP loop(chg fit) and sdg2 as goods loop with direct reception and dispatch facilities.
CAP
5.73
49
SCR
Yerraguntla~~Yerraguntla: By pass line connecting NDL – YA line and GTL – RU line for the trains from and to MOO.
DF3
16.90
50
SCR
Chandragiri (TPTY - KPD section): Additional loop line (Standard lay out)
DF3
11.30
51
SCR
Nizamabad- Remodelling of yard arrangements for providing additional platforms and one full length dead end spur.
CAP
8.80
52
SCR
Nagarsol~~Provision of two (02) additional loop line at Nagarsol (NSL) Station in AWB- MMR Section.
CAP
12.34
53
SCR
NAMBURU~~MANGALAGIRI~~Provision of IB Signals between NBR-MAG and MAG-NBR sections.
CAP
3.26
54
SER
Proposal for provision of loop line in UP and DN direction at MURADI station in Adra Division.
CAP
26.45
55
SER
Proposal for Crossing station (Block stations) at Beliatore ( BZC) and Rainagar (RNGR) along with Two loop lines in BDR section of Adra Division.
DF3
34.73
56
SER
Burnpur removal of diamond crossing at KM 319/17-21 at Burnpur yard for removal of PSR
RRSK
3.18
57
SER
Bankra Nayabaz : Additional Loop lines.
CAP
11.74
58
SER
Construction of Up loop line at KITA
CAP
11.78
59
SER
Ramkanali extension of line no.- 05 & 06 for accommodation of full length train.
CAP
12.15
60
SECR
Provisioning of additional UP & DN loop lines at Marwarani station.
CAP
40.09
61
SECR
Doubling of IB-Jharsugauda Raod by- pass line.
CAP
104.74
62
SECR
Khodri-Khongsara - Conversion of down line as twin single line
CAP
3.43
63
SECR
Provisioning of IBS between both KOI- BHTK and BHTK-KGS section on DN Line
CAP
5.70
64
SECR
KGS: Conversion of Bamboo Siding into running line
CAP
7.12
65
SECR
Raipur~~Extension of line no.07 with construction of full length passenger platform and connectivity to DN line at R
CAP
18.28
66
SECR
Construction of an additional full length line at Durg.
CAP
8.68
67
SECR
Raipur~~Provision of Shunt Signal facility at East & West end of Raipur for facilitating Shunting movement.
CAP
4.32
68
SECR
Nagpur division- Provision of additional loop line at Chanda Fort with extension of existing bridge.
CAP
11.65
69
SECR
Baikunth~~Conversion of BKTH (E) &(W) into a Single Block station by provision of inter-slotting arrangement between the two cabins.
CAP
4.89
70
SECR
Provisioning of Automatic Signalling from Gevra to Champa section
CAP
34.59
71
SECR
Nagpur Division-Construction of new Goods shed of shifting of goods shed at Rajnandgaon
DF3
37.48
72
SWR
Automatic Signalling between WFD-BWT(47kms)
CAP
74.20
73
SWR
Chandar Goa: Proposal for construction of new coaching terminal.
CAP
133.90
74
SWR
TNGL: Provision of 02 addl. loop line with R&D facility adjacent to Rd-1
CAP
13.48
75
SWR
SBC Yard Remodelling
CAP
13.55
76
SWR
Hosur~~Hosur~~HSRA-Provision of Additional Loop Line on Road-05
CAP
6.71
77
SWR
Belagula:Provision of two additional running/stabling lines in the existing yard.
CAP
12.85
78
WR
Chhayapuri: Development of station as second terminal
CAP
43.53
79
WR
Churchgate~~Virar~~Churchgate - Virar:- Removal of PSR by removal of 2 Nos diamond crossings & proposed 4 Nos crossovers at Santacruz (N).
RRSK
4.63
80
WCR
Chord line between Kushtala –Devpura(NWR) avoiding Sawaimadhopur station.
CAP
107.77
81
WCR
Kachhapura- Provision of Chord line  for providing direct despatch of trains coming from Gondia (SECR) side to Itarsi side.
DF3
27.85
82
NR
AY-Development of Coal siding 1&2
CAP
4.00
83
NR
Jhalandhar Cantt-Jammu Tawi-Provision of IBS between BBMN-JAT, SMBX-VJPJ and PTKC-KNDI on JRC-JAT section
CAP
6.98
84
NR
KHASA-Development of Khasa as freight terminal
CAP
15.35
85
NR
Provision of IBSs at 11 locations between LKO-SRE section
CAP
26.12
86
NR
Direct connectivity of UP GAL with UP Goods lines and DN GAL with DN Goods lines to provide 3rd & 4th line in Tughlakabad yard.
CAP
33.24
87
NR
Asaoti - Addition & alteration i/c/w provision of High rise OHE at Asaoti/Piyala station and merger of DFCCIL western corridor at Asaoti yard.
CAP
31.10
88
NR
Improvements in Goods terminal at KUN, SHDM, GZB, PRTP to reduce terminal detention.
CAP
12.88


TOTAL

3595


List of New Sanctioned Works under 
Electrification PH-35 2018-19 (as per RE Dte.)


S.No
Rly.
Name of Project
RKM
TKM
Cost
(Rs. Cr.)
1
CR
Lonand-Phaltan
26
26
19.96
2
ECoR
Khurda Road - Balangir
301
343.4
269.09
3
ECoR
Lanjigarh Road- Junagarh Road
56
70
56.51
4
ECoR
Naupada-Gunupur
90
112
89.82
5
ECR
Dauramadhepura-Purnia
77.3
102.4
81.06
6
ECR
Muzaffarpur - Sitamarhi
64.52
88.52
70.99
7
ECR
Dildarnagar-Tarighat
18.67
20
15.63
8
ER
Katwa-Ahmadpur
52
83.5
53.66
9
ER
Rampurhat(excl.) – Dumka - Bhagalpur(excl.) & Jasidih - Deoghar - Dumka(excl.) incl. Barahat - Banka(excl.) -Chandan - Deoghar and Madhupur - Giridih
361
419
304.52
10
NCR
Barhan-Etah
59
65
52.13
11
NCR
Mahoba-Udaipura
196
216
168.2
12
NER
Gorakhpur-Anand Nagar-Gonda & Anand Nagar-Nautanwa
261.61
308
202.94
13
NER
Gonda- Bahraich
59.84
73
62.19
14
NER
Moradabad-Kashipur-Ramnagar, Rampur-Lalkua-Kathgodam incl. Lalkua-Kashipur and Bareilly-Lalkua
309
347
236.73
15
NER
Paniahwa - Chhitauni – Tamkuhi Road
67.69
76.49
61.11
16
NER
Shahjahanpur-Pilibhit, Pilibhit-Tanakpur
145.46
175
143.15
17
NER
Hathua-Bathua Bazar- Bhatni New line
79.6
90
70.35
18
NER
Salempur-Barhaj Bazar exisiting BG line
20.25
22
13.11
19
NER
Duraundha-Maharajganj-Masrakh
41.53
48
38.19
20
NER
Mandhana Jn-Brahmavard
8
10
6.98
21
NFR
Aluabari-Siliguri via Baghdogra
76.23
104.32
59.6
22
NFR
Chaparmukh-Silghat Town incl. Senchoa Jn-Mairabari single line
130
139
109.35
23
NFR
Lumding-Badarpur single line
172
238
189.04
24
NFR
Badarpur-Jiribam, Katakhal-Bhairabi & Badarpur-Karimganj-Sabroom incl. Karimganj-Maishasan, Agartala-Akhaura  & Baraigram-Dullabachera
590
689
494.24
25
NFR
Rangiya Jn.- Rangapara- Harmuty - Naharlagun including branch lines
339
398
311.09
26
NFR
Mariani-Jorhat town-Furkating & Tinsukia Jn -Makum-Tirap & Makum-Dangri single line
174
233
183.99
27
NFR
Harmuty-Murkongselek including branch line
230
308
237.52
28
NFR
Katihar – Jogbani single line
109
139
109.91
29
NFR
Raninagar– Haldibari single line
34
40
27.71
30
NFR
New Jalpaigudi-New Mal Jn-Alipurduar-Samuktala and Alipurduar-New Coochbehar incl. New Mal Jn- Changrabandha, New Changrabandha- New Coochbehar,  New Coochbehar – Bamanhat, New Coochbehar –Fakiragram-Dhubri
506
590
475.31
31
NFR
Katihar-Teznarayanpur, Barsoi-Radhikapur & Eklakhi-Balurghat single line
176
192
154.87
32
NR
Prayag-Prayag ghat
2.46
2.46
0.68
33
NR
Raebareli-Unchahar incl. Dalmau-Daryapur
63
70
44.92
34
NR
Phaphamau-Pratapgarh
46
50
36.9
35
NR
Akbarpur-Faizabad-Barabanki
161
376
211.7
36
NR
2nd Line Utratia-Raebareli-Amethi
126
155
63.32
37
NR
Amb Andaura-Talwara
40
56
34.21
38
NR
Bhatinda-Firozpur-Jalandhar City Incl. Lohian Khas-Nakodar-Phillaur & Nakodar-Jalandhar
301
360
223.93
39
NR
Ludhiana - Ferozpur City - Hussainiwala including Ferozpur City – Fazilka - Abohar & Kotkapura - Fazilka
339
382.52
235.08
40
NR
Phagwara Jn. - Nawanshahar Doaba-Jaijon Doaba incl. Nawanshahar-Rahon
74
82
56.89
41
NR
Jalandhar City - Hoshiarpur
38.4
45
31.81
42
NR
Verka Jn. - Dera Baba Nanak
45
54
33.38
43
NR
Taran Taran - Patti - Khemkaran
54.4
58
41.79
44
NR
Batala Jn. - Qadian
19
21
11.35
45
NR
Bathinda Jn. - Abohar-Sri Ganganagar
125
171
116.75
46
NR
Sonipat- Gohana- Jind
86
103.2
80.55
47
NR
Raja Ka Sahaspur-Sambhal Hatim Sarai
23
24
15.84
48
NR
Faizabad - Sultanpur-Chilbila
94.4
101
60.14
49
NR
Janghai-Zafrabad
47
72
49.19
50
NWR
Luni-Marwar
71.71
85.69
56.58
51
NWR
Bikaner-Merta-Jodhpur and Merta-Phulera
424
503
374.63
52
NWR
Degana - Ratangarh
142.89
158.94
111.55
53
NWR
Hanumangarh-Sriganganagar-Sarupsar-Suratgarh incl Sarupsar-Anupgarh
281
329
228.87
54
NWR
Hisar-Suratpura
64.6
73.67
49.96
55
NWR
Samdari - Barmer-Munabao
250.29
281.64
173.75
56
NWR
Udaipur City - Himmatnagar
209.66
260
194.29
57
NWR
Sikar-Loharu
122
140
102.51
58
NWR
Mavli – Bari Sadri
82
82
55.24
59
NWR
Dausa-Gangapur city
93
115
77.46
60
NWR
Madar-Pushkar
25.7
30
22.95
61
NWR
Ringas-Sikar-Churu
140
170
96.31
62
NWR
Thiyat Hamira-Sanu incl. Pipar Road-Bilara,Makrana-Parbatsar and Merta Rd-Merta city
135.72
157.32
90.09
63
SCR
Parli Vaijnath – Vikarabad
269
336
262.12
64
SCR
Pimpalkutti-Mudkhed & Parbhani -Parli Vaijnath
246
307
224.17
65
SCR
Tenali-Repale
34
36
25.98
66
SCR
Nandyal-Yerraguntla
123
144
111.48
67
SCR
Purna-Akola
209
261
211.58
68
SCR
Lingempet Jagtiyal-Nizamabad
95
100
80.29
69
SCR
Dharamavaram-Pakala
228
260
210.47
70
SCR
Gadwal-Raichur
57
59
46.1
71
SECR
Tumsar Road - Tirodi
46.8
68.84
53.51
72
SECR
Balaghat-Katangi
46.8
59
43.36
73
SECR
Marauda- Dallirajhara
76
96
75.96
74
SECR
Tirodi-Katangi
15
15
6.53
75
SECR
Wadsa-Gadchiroli
49.2
49.2
37.87
76
SER
Rupsa-Bangriposi
89
96
68.66
77
SER
Bankura-Mashagram
118
130
92.8
78
SER
Tata-Badampahar
89
98
70.08
79
SER
Loops and Yard Lines
0
180.57
116.85
80
SR
Dindigul-Palghat
179
206
159.08
81
SR
Tiruchchirapalli-Manamadurai-Virudunagar
217
244
193.44
82
SR
Salem-Vridachalam-Cuddalore Port
196
222
179.27
83
SR
Shoranur-Nilambur
66
71
53.68
84
SR
Kollam-Punalur
44
50
43.44
85
SR
Virudunagar - Tenkasi Jn
122
131
94.45
86
SR
Sengottai- Tenkasi Jn. - Tirunelveli-Tiruchendur
141
154
121.14
87
SR
Madurai - Manamadurai Jn.-Rameswaram
161
182
158.28
88
SR
Pollachi-Podanur
40
42
37.36
89
SWR
Hospet-Swamihalli
59
95
61.81
90
SWR
Birur-Talguppa
161
184
151.99
91
SWR
Mysuru- Hassan-Mangalore incl. Arsikere -Hassan
347
410
315.81
92
SWR
Mysuru-Chamarajanagar
61
71
56.71
93
SWR
Kadur-Chikmaglur
46
53
39.74
94
SWR
Chikbanavar-Hasan
166
199
155.17
95
SWR
Bangarpet-Yelehanka
149
170
138.21
96
WR
Kanalus-Wansjalia-Porbandar
103.33
133.33
96.82
97
WR
Rajkot-Jetalsar-Verval-Somnath with Jetalsar-Wansjalia
277.54
313.54
223.73
98
WR
Vasad- Kathana
43
50
40.1
99
WR
Anand- Khambhat
51.79
60
48.12
100
WR
Vishvamitri - Pratap Nagar -Chhota udepur
102
130
95.71
101
WR
Kanjari Boriyavi- Vadtal
6.4
8
5.71
102
WR
Nadiad- Modasa
104.79
130
99.33
103
WR
Ankleshwar - Rajpipla
62.84
75
58.82
104
WR
Jhund-Kharagoda
23.3
30
23.27
105
WR
Adipur- New Bhuj
48.94
61
48.36
106
WR
Mahesana- Patan-Bildi
90.61
120
96.24
107
WR
Dhola- Bhavnagar with Sihor Jn.- Palitana  & Rajula Road Jn- Mahuva
119.21
154
121.51
108
WR
Mhow-Khandwa
138
160
127.82


TOTAL
13676
16540
12135


5 comments:

  1. This comment has been removed by the author.

    ReplyDelete
  2. nanded bidar via Degloor new line under umbrella project

    ReplyDelete
  3. goyal sir please nanded bidar at via degloor new line survey imidiate under umbrella project start action order goes to secr division

    ReplyDelete

Always Welcome for Your Valuable Ideas